Application for Electrical Permit
Download
The electrical permit is valid for a maximum of twelve (12) months from the date of issue, after 12 months it becomes null and void. If work has not been completed, a second permit shall be required to be purchased at the fee which is then currently charged. This permit becomes null and void if work or construction authorized is not commenced within six (6) months OR if construction or work is suspended or abandoned for a period of six (6) months at any time after work is begun.
Upload
Once you download and fill out the application, you may scan and upload the form by clicking the upload files button below.
For more information, please contact City Hall at 770 574-2345.